In remote mountainous areas and field construction sites far from the power grid, how can the power needs of construction camps be effectively guaranteed? Traditionally, diesel generators provide electricity, but the problems of fluctuating oil prices, high transportation costs, significant noise pollution, and frequent start-stop cycles have long plagued users.

PowerLink‘s PES and BES series hybrid energy systems are designed specifically to solve these problems, offering a solution centered on “oil-solar-storage complementarity.” This solution combines photovoltaic power generation, battery energy storage, and diesel generators, aiming to provide a reliable energy supply that is both economical and environmentally friendly for field construction camps.

Figure 1 Field construction camp

 

Hybrid EnergySolution

    • Solution Logic

Based on the concept of “PV as the main source, energy storage for peak shaving, and diesel for emergency use,” the system achieves energy self-sufficiency using solar roofs, indoor inverters, and battery cabinets. By optimizing energy efficiency, it achieves efficient energy collection, storage, and distribution according to camp load and natural conditions, ensuring “uninterrupted, low-cost, and pollution-free” power supply, while using diesel generators as an emergency backup power source.

Customized solutions, ranging from small to large, are provided for camps of different sizes to meet diverse electricity needs.

Figure 2 Application schematic diagram of PES series

Figure 2 Application schematic diagram of PES series

  • What are the main core configurations?

The core of the hybrid energy system consists of high-efficiency photovoltaic modules, lithium iron phosphate energy storage batteries, an EMS intelligent control system, a bidirectional inverter, and a diesel generator (for emergency backup). The EMS system achieves dynamic balance between photovoltaic, energy storage, and load, supports automatic switching of “photovoltaic-energy storage priority” to ensure stable power supply, and the diesel generator serves as an emergency backup energy source.

Customized according to camp size:

  • Small campsite (10-30 people): Recommended configuration: 5-10kW PV + 10-20kWh energy storage. Core product selection: BES20S energy storage product + optional small diesel generator to meet basic power needs and reduce diesel reliance;
  • Medium campsite (30-100 people): Recommended configuration: 20-50kW PV + 50-100kWh energy storage. Core product selection: PES100 energy storage system + 50kW backup diesel generator to support small construction equipment and living loads, meeting the campsite’s power needs;
  • Large campsite: Based on the campsite’s energy needs, configure 100kW or more PV + 200kWh or more energy storage, such as PowerLik’s PES300 or higher energy storage battery equipment, paired with a diesel generator, to meet the needs of heavy equipment. PV penetration exceeds 70%.

Intelligent Operation Modes:

  1. Daytime: Photovoltaic modules prioritize power supply to meet the camp’s real-time load; excess electricity is stored in the energy storage system.
  2. Nighttime/Rainy Days: The energy storage system discharges to supply power; when the power level falls below the 20% threshold, the diesel generator automatically starts to supplement power.
  3. Extreme Conditions: The energy storage system instantaneously supports the load, avoiding voltage fluctuations; the diesel generator starts in coordination to ensure continuous operation of core equipment.

Case

A large field construction camp (80 people, including heavy construction equipment) achieved significant benefits after connecting to a PowerLink 150kW photovoltaic + 200kWh energy storage system:

  • Diesel consumption: Reduced from 800 liters per day to 150 liters, saving 120,000 yuan in fuel costs per month and over 1.4 million yuan per year;
  • Return on investment: The entire equipment investment can be recovered in 2.5 years, with energy cost savings exceeding 12 million yuan over its entire lifecycle (10 years);
  • Power supply reliability: Increased from 95% to 99.9% compared to traditional diesel generators, completely solving the problem of power outages during construction;
  • Environmental benefits: Reduced carbon dioxide emissions by 180 tons annually (150kW photovoltaic), achieving one-time environmental acceptance and avoiding environmental penalties;
  • Operation and maintenance costs: The remote monitoring system enables fault early warning and data visualization management, reducing manual inspection frequency by 70% and operation and maintenance costs by 50%.

Energy Storage Product Introduction

PowerLink’s mobile hybrid energy storage products include three major series: BES, PHE, and PES, with power ranging from 20KWe to 500KWe and lithium iron phosphate battery capacities from 30.7 to 1040KWh, meeting the differentiated needs of campsites of different sizes.

Core Features:

  • High Reliability: Lithium iron phosphate battery with IP54 protection rating, suitable for wide temperature ranges from -20℃ to 55℃, vibration and shock resistant, adaptable to complex field conditions;
  • Intelligent Control: Equipped with a self-developed EMS system, supporting automatic switching between photovoltaic-storage priority and diesel backup modes, remote APP/PC monitoring, real-time viewing of power generation, energy storage status, equipment fault data, etc.;
  • Rapid Deployment: Integrated design, no complex civil engineering required, installation and commissioning completed within 1 day for small campsites, and put into use within 3-5 days for medium to large campsites;

Safety Protection: Equipped with multiple protection functions including overcharge, over-discharge, over-temperature, and short circuit protection, the battery pack adopts an explosion-proof design, meeting outdoor safety operation requirements.

Figure 4 PES500 Product Diagram

Figure 5 BES80S3 Product Diagram

PES Series Parameter Table((Preferred for medium and large campsites))

Model Power

(KWe)

Voltage

(V)

Phase Battery capacity (KWh)
PES30 30 380/400/415 3P/4W 62
PES60 60 380/400/415 3P/4W 92
PES100 100 380/400/415 3P/4W 115.2
PES200 200 380/400/415 3P/4W 230.4
PES300 300 380/400/415 3P/4W 345.6
PES400 400 380/400/415 3P/4W 460.8
PES500 500 380/400/415 3P/4W 576

BES Series Parameter Table((Preferred for small campsites / temporary scenes))

Model Power

(KWe)

Voltage

(V)

Phase Battery capacity (KWh)
BES20S 20 220/230/240 1P 30.7
BES30S3 30 380/400/415 3P/4W 30.7
BES45S3 45 380/400/415 3P/4W 50.7
BES80S3 80 380/400/415 3P/4W 101.4

 

 

Conclusion

  • Improved Power Supply Reliability: The combined protection of photovoltaic and energy storage systems with diesel refueling enhances power supply reliability to 99.9%, completely resolving the “power outage” problem associated with traditional generators and ensuring continuous operation of construction equipment and comfortable living conditions for personnel.
  • Achieving Green Compliance: Photovoltaic power generation is noiseless and emits no pollutants. Each 100kW photovoltaic system reduces carbon dioxide emissions by approximately 120 tons annually, helping construction projects achieve “green construction” targets and mitigating environmental penalties.
  • Flexible, Convenient, and Easy to Maintain: Modular design supports rapid installation and relocation; a single system can be reused by the construction team. The intelligent monitoring system enables remote operation and maintenance, providing timely fault warnings and reducing manual inspection costs.
  • Reduced Energy Costs: Remote monitoring lowers operation and maintenance costs.

Choose PowerLink for worry-free power supply for field construction and make green construction feasible!

--- END ---

Prev:

Already the latest article

Get A Free Quote

All products provided by our company are energy products
Welcome to contact us