Hybrid System-Telecom station

Request A Quote

Telecom station

As global construction emission standards tighten—with stricter 2026 regulations taking effect—achieving compliance while controlling costs has become a top pain point for contractors. PowerLink Hybrid Battery emerges as an absolute on-site necessity, addressing core operational challenges with seamless precision.
Tower cranes demand massive instant power on startup, a requirement that traditionally forces reliance on oversized, costly diesel generators. These generators operate inefficiently most of the time, driving up fuel costs and emissions. PowerLink tackles peak load fluctuations effortlessly, eliminating the need for such bulky equipment and cutting rental expenses significantly.
Beyond crane support, it serves as a mobile fast-charging hub for welders, pumps, lighting, electric excavators and dump trucks. This solves the nagging issues of slow charger deployment and off-grid charging gaps that plague job sites.
PowerLink delivers compliant, cost-efficient power without compromising productivity, ensuring projects stay on track amid evolving environmental rules. For forward-thinking contractors, it is no longer an option but a strategic solution to navigate 2026’s regulatory shifts and operational pressures.

TES3000

PowerLink PES Series is a portable hybrid energy system  (30-500kWe, 62-1040kWh) designed for construction sites, mining, power rental, and islands. It supports external PV/gen/grid input, it crushes peak load demands while slashing 90% of large generator runtime—cutting OPEX drastically.

Equipped with plug-and-play design, smart cloud monitoring, and -20°C~55°C operating range, it delivers reliable power for tools, electric equipment, and fast charging. Lithium iron phosphate batteries ensure safety, long cycle life, and easy maintenance. Compliant with tightening emission rules, it’s your cost-saving, eco-friendly solution for uninterrupted on-site power.

TES6000

PowerLink PHE Series is a premium off-grid hybrid system (125-500kWe, 237-1040kWh) for mining, marine, and events. Features built-in diesel genset, plus support for external PV/wind/grid, it delivers 125-500kWe output with 237-1040kWh scalable liquid-cooled battery capacity and 1C charge/discharge rate.

Equipped with intelligent EMS, cloud monitoring (APP/WEB), and multi-layer protection (firefighting, overload, temperature control), it ensures 24/7 reliable operation. Portable, easy-maintain, and compliant with global certifications (IEC/UL/UN 38.3), it cuts costs while boosting energy self-sufficiency—ideal for off-grid or backup power needs.

TES12000

PowerLink BES Series is a compact all-in-one hybrid energy solution engineered for off-grid needs—remote islands, rural areas, communication stations, construction sites, and households. It integrates built-in diesel genset and PV modules.With 20-80kWe output, 30.7-101.4kWh liquid-cooled battery capacity, and Stage V emission compliance, it delivers echelon cost energy use.

Featuring plug-and-play design, IP54 protection (-20~50℃ operation), and intelligent EMS with cloud/Web/APP monitoring, it ensures stable, low-cost power. Equipped with forklift holes for easy mobility, multiple safety protections, and 2-year unit/5-year battery warranties, it’s certified to global standards (IEC/UL/UN38.3) for reliable off-grid performance

Our Support Services

Pre-Sale Support

Pre-Sale Support

Get expert advice, product insights & tailored solutions for your energy needs.

HMI Interfaces

HMI Interfaces

Customize interfaces matching customer brand visuals & operating habits.

Spare Parts

Spare Parts

Access parts, manuals & service tools via Powerlink Online Portal-DPMS.

After-Sales Support

After-Sales Support

For partners, we ensure that core parts can be delivered within 24 hours.

All products provided by our company are energy products
Welcome to contact us