Uninterruptible Data Center Hybrid System Solutions

Rapid data center expansion frequently outpaces local grid capacity. During facility construction, grid connection delays create severe power shortages for site operations and server pre-commissioning. Post-deployment, strict utility peak-load limits restrict high-density computing operations. Furthermore, unexpected grid failures introduce a critical latency window before backup diesel generators activate, threatening enterprise data integrity and server uptime.

A Powerlink data center hybrid system directly resolves these infrastructure gaps. During the construction phase, the unit delivers independent temporary power, supporting site build-outs and facility testing without relying on temporary diesel setups. Once operational, the system executes automated peak shaving. When computing loads exceed permitted utility thresholds, the battery energy storage instantly discharges to sustain server operations and avoid grid penalties.

During utility outages, the equipment functions as an industrial uninterruptible power supply (UPS). It provides immediate power bridging, sustaining critical cooling and IT loads during the startup sequence before heavy diesel generators synchronize. This scalable data center hybrid system ensures strict utility compliance, lowers peak power costs, and guarantees continuous operation for heavy computing facilities.

PES Series

The Powerlink PES Series provides 30-500kWe output and 62-1040kWh battery storage, serving as a rapidly deployable data center hybrid system. Engineered for facility construction and modular IT deployments, this portable unit integrates temporary grid and generator inputs. By executing automated peak shaving, it reduces temporary diesel runtime by 90% and mitigates local grid capacity limits.

Operating from -20°C to 55°C, it delivers continuous temporary power for server pre-commissioning and critical site operations. Premium lithium iron phosphate cells ensure thermal safety, rapid deployment, and uninterruptible bridging power.

PHE Series

The Powerlink PHE Series provides 125-500kWe output and 237-1040kWh scalable liquid-cooled battery storage, functioning as a robust data center hybrid system. Integrating a built-in diesel generator with utility inputs, it ensures absolute power redundancy for mission-critical IT facilities. Operating at a precise 1C charge/discharge rate, it instantly assumes heavy server loads, providing seamless UPS power bridging during grid latency windows.

Equipped with intelligent EMS and active firefighting protections, it guarantees 24/7 facility uptime. Compliant with global IEC/UL standards, it secures continuous enterprise data processing.

Our Support Services

Pre-Sale Support

Pre-Sale Support

Get expert advice, product insights & tailored solutions for your energy needs.

HMI Interfaces

HMI Interfaces

Customize interfaces matching customer brand visuals & operating habits.

Spare Parts

Spare Parts

Access parts, manuals & service tools via Powerlink Online Portal-DPMS.

After-Sales Support

After-Sales Support

For partners, we ensure that core parts can be delivered within 24 hours.

Frequently Asked Questions

Can a data center hybrid system power Level 4/5 commissioning?

Yes. Grid connection delays frequently stall facility testing. Our containerized units provide immediate, independent site power. This allows facility engineers to fully test heavy chillers, HVAC systems, and server halls at full load, keeping the project schedule on track without waiting for the permanent utility feed.

How does battery storage bridge the outage latency window?

By instantly discharging at a precise 1C rate. The hybrid energy system acts as an industrial ride-through UPS, sustaining mission-critical IT loads seamlessly without the 10 to 15-second startup delay of conventional backup equipment.

Do data center hybrid systems consume indoor white space?

No. These energy solutions are fully containerized for outdoor deployment. This preserves your maximum indoor footprint for revenue-generating server racks while safely relocating battery weight and fire risks outside the main facility.

How does the equipment handle utility MW capacity overloads?

The intelligent EMS executes automated peak shaving. It actively monitors the incoming grid feed and injects stored battery power to cover excess loads, keeping the facility strictly within its permitted utility limits and avoiding penalties.

Why choose hybrid energy systems over temporary construction generators?

Relying on standard rental generators incurs massive fuel costs. Deploying a data center hybrid system early provides silent, continuous, and low-emission electricity for site operations, significantly reducing your initial project OPEX.