Data Center Power Solutions
PowerLink supplies data center generator solutions for AI data centers, hyperscale campuses and Tier III/IV critical facilities. The AIDC range covers containerized diesel generator sets with 400V/480V low-voltage and 4.16kV/10.5kV/11kV/13.8kV medium-voltage output. Single units from 2000 kW, scalable to MW-level parallel clusters. Full rated power at 50℃ ambient without derating. Tier III standby response within 3 seconds. Designed to handle non-linear UPS loads and to suppress harmonic grid distortion..
Heat-Proof Power
Full rated power at 50°C, no derating
Resilient Structure
Optimized design for steady low-noise operation
Modular container design
30% less space with modular container design
Non-linear grid pollution
Eliminates grid pollution from non-linear loads
Tier III Grade
Recover in 3 seconds, meeting Tier III grade
Capabilities
R&D Capabilities
- Simulation-Driven Design
- Digital twin synchronization with 1:1 model delivery across design phases
- CAD/CAE-based design
- FEA for seismic strength validation on container structures
- CFD for container air duct thermal flow simulation
- Pre-performance verification before prototype manufacturing
Multi‑Discipline Engineering
- HVO bio-fuel compatible pipeline engineering
- Fire protection, ventilation and exhaust overall layout
- Noise reduction and vibration isolation system tuning
- Supply air and exhaust airflow balancing
- AI prediction and proactive maintenance and intelligent diagnosis
- Medium and low voltage power distribution system integration
Global Supply Chain
- Long-term cooperation with world-class core part suppliers
- Multi-region dual-source procurement mechanism for core key parts
- Full-link strict quality control system
- Guarantee stable supply of components
- Custom-configured accessories for special site requirements
Flexible Manufacturing
- End-to-end digital management (CRM/ERP/MES)
- Real-time monitoring from material traceability to process quality inspection
- Prefabrication and parallel assembly agile production mode
- Independent serial number record for every complete unit
- Customized flexible production for special projects
Full‑Lifecycle Service
- Local services across Europe, Americas, Australia, China and the Middle East
- Round-the-clock remote monitoring and fault diagnosis
- After-sales maintenance and spare parts support
- Complete one-stop turnkey project coordination
- DPMS (Digital Parts Management System) for fast order fulfilment and online part selection
Data Center Gensets
400/480V Output
AI data centers face critical power‑resilience hurdles. Heavy workloads require instant stable backup, yet conventional generator setups bring costly transformers, tricky site integration and extended timelines to hit Tier III/IV redundancy rules.
PowerLink 400V / 480V containerised gensets are pre‑engineered for large‑scale AI facilities. They eliminate transformer spend and streamline project delivery. Supporting multi‑unit paralleling for N+1 and 2N redundancy, each unit undergoes factory full‑load testing with smart PLC controls to protect GPU‑intensive operations.
Data Center Gensets
4.16/10.5/11/13.8KV Output
Built for AI data center campuses with long-distance power distribution requirements.
PowerLink 4.16kV‑13.8kV containerised gensets span from 2500kW to 3600kW, delivering medium‑voltage output tailored for large mission‑critical compute facilities.
Cutting long‑distance cable investment and energy waste, supporting N+1 and 2N redundancy. Available in 50Hz / 60Hz configurations, they deliver proven uninterrupted standby protection for GPU‑intensive AI infrastructure.
Fuel Tank
PowerLink double-walled self-bunded fire-resistant diesel tank addresses data centers core risks of fire breakout, fuel leakage and regulatory non-compliance.
Certified with UL 2085 4-hour fire rated and AS 1692 / AS 1940 certifications. Innovative composite insulation with lightweight grout reduces tank weight without sacrificing thermal performance.
Built-in 110% secondary containment plus smart leak sensing mitigates spill hazards. Factory-validated, it delivers dependable on-site fuel storage for mission-critical data center infrastructure.
International Standards and Trust
Reliability is our promise. PowerLink data center generator sets are designed and manufactured under strict quality control.
Comply with international standards including ISO 9001, ISO 14001, ISO8528,IEC60529-2013, UN38.3. Every unit undergoes full-load testing before shipment to verify voltage regulation, load acceptance and harmonic performance.
Global Service Coverage
Strict Quality Control
Customized Solution Support
Case Study
PowerLink 2000kW COP Modular PowerPod Solution for Data Center
- Equipment: 2500KVA intelligent container genset
- Scheme: Double-layer staggered stacking backup power system
- Field: High-reliability power guarantee for Tier III/IV AIDC
- Power Range: 2000kW single unit, scalable MW-level cluster
...
Read more