Australian Remote Copper Mine
Jul 05,2021
- Location: Central QLD, Australia
- Equipment: 3*GMS1375CS-AU & 1*WCS550CS-AU
- Electric output mode: Prime Supply
- Field / fuel: Mining / Diesel
- Total output power: 4MVA
The Rockland Copper Mine, located 25km NW of Cloncurry QLD, required a remote, stable power solution to supply the crushing and processing plant onsite. With the ambient temperature in Summer reaching 50°C, the setup needed to be robust and reliable to operate efficiently in the harsh conditions.
PowerLink’s diesel generators were chosen for the job – 3 x GMS1375CS-AU and 1 x WCS550CS-AU. During the day, the 3 x GMS1375CS-AU units started the crusher and load shared according to load priority minimising fuel consumption. At night, the WCS550CS-AU was the sole power source.
The diesel generators were connected a large bulk fuel tank, located behind the setup, allowing for automatic fuel top ups.
A 6000amp centre feed main board lifted onto a galvanised walkway was manufactured in Australia by Powerlite to suit the set up.
The control cabinet was located one kilometre from site and overlooking the entire crushing/power plant. The control cabinet was a 20ft shipping container modified and raised for cooling. Air conditioning was installed for the employees.
Prior to installation, all equipment, including the PowerLink diesel generators, were imported via Brisbane and a staging area was set up in Toowoomba. Two road trains took all of the units to site for installation.
Installation and commissioning was carried out over a 6 week period after the slab was poured and earthing grid was in place.